£2m Pickering flood defence scheme almost complete

Flooding in Pickering in 2013

Flooding in Pickering in 2013

First published in News

WORK to protect a town from flood damage as part of a £2m scheme is well underway.

The long-awaited scheme, known as Slowing the Flow, will combat flooding in Pickering and the main control structure is now almost completed.

Experts said the scheme, which was shelved over two years ago due to costs, will reduce the chances of flooding in the town from 25 per cent in any one year to four per cent or less. Once the control structure is completed it will be covered with clay to create a two-metre bund wall.

Mike Potter, chairman of Pickering and District Civic Society, said: “The top and downstream side of the bund will be covered with a grasscrete facing to reinforce it in the event of water overtopping. Upstream, the lateral bund alongside the railway to protect it from floodwater is almost complete too. It has been a long road but we’re on the final lap.”

The scheme will hold back more than 100,000 cubic metres of water and steel posts will stop trees and branches from blocking the outflow in flood conditions.

Send us your news, pictures and videos

Most read stories

Local Info

Enter your postcode, town or place name

About cookies

We want you to enjoy your visit to our website. That's why we use cookies to enhance your experience. By staying on our website you agree to our use of cookies. Find out more about the cookies we use.

I agree